Provisional meeting readout
Board of Trustees meeting
July 13, 2026
A topic-by-topic guide to what was discussed, what residents raised, and what the board decided.
- Recording
- 56 minutes
- Coverage
- 11 sections
- Linked issues
- 5
- Status
- Needs review
This is not an official transcript or approved minutes. It is based on machine transcription and may contain errors. The summaries and excerpt selections have been reviewed for publication, but the township video and official records remain authoritative.
Section 1
Michigan Titanium Triathlon plans 2026 event at Versluis Park
Michigan Titanium organizers previewed the August 16 endurance event at Versluis Park. Trustees expressed support and praised its community value and safety operations.
Key details
Questions or concerns
- Comments emphasized course safety and hot-weather preparations. 11:46
This was a presentation; the selected passages contain no board motion or vote. 12:54
Review notes: Most route and road-closure details are outside the selected excerpts and should be checked against presentation materials.
Read 11 relevant transcript excerpts
Next item on our agenda is a presentation from the Michigan titanium group for the event This year how you doing?
Evening, there we go John Conkling I am one of the race directors for the Michigan titanium event that's coming up here before we know it in August and We have a presentation tonight for this year's race As you see here, it will be on August 16th at Versluis Park just like it has been All the same parameters as previously we start racers at 7 a.m. And for the longer distance folks they have till midnight to get back to the finish line so it uses
Concludes the road closure maps and presentation I have for tonight, so I'd be happy to answer any questions or comments Okay, thanks, John
Frank you have anything
Just appreciate you guys being here every year Thank you. Oh Susan
Me too, we would have figured something out, but me too
This is a great event. It's one of the crown jewels of Plainfield next to LPGA and then my tie it's it's kind of bookends of the summer. It's Been a participant for many many years that your staff is excellent safety out on the course is a Way above par. I'm very
Supportive of this and I'm glad to see it here again. We are I appreciate your being here
I have hopes that the weather will be a little different than today. Well
Today was actually cooler than what last year was so I'll take anything better than last year, but we made it and we had lots of ice lots of athletes and and surprisingly You get do get heat related issues? And we had a very very low incident of really anything because athletes were pacing themselves Not pushing themselves and taking advantage of the cooling towels ice the missing fans everything that we kind of had set up for him. So
Great. Yeah. Thank you very much again for being here again. Appreciate it. Appreciate it. Appreciate what you bring to the community Definitely benefits all thank you
Section 2
Proposed crosswalk to connect Woodwater Drive to South Rogue River Trail
This item was handled as part of the consent agenda. The selected transcript contains the motion and roll-call vote, but no separate discussion of the crosswalk change order.
Key details
- The motion approved the agenda, revised consent agenda, and accounts payable together. 18:55
The combined motion carried by roll-call vote. 19:17
Review notes: Consult the agenda packet for the substance of the change order; no item-specific discussion was captured.
Read 6 relevant transcript excerpts
I make a motion for the approval of our agenda, including the consent agenda and accounts payable with a revision to item E.
I make a motion we approve the agenda, including the consent agenda as revised and the accounts payable.
Thank you, Jack. Support? Support. Thank you, Frank. Roll call vote, please.
Mr. Coleman.
Yes.
Ms. Batey. Yes. Mr. Hagedorn. Yes. Mr. McKellar, yes. Mrs. Morrow. Yes. And Mr. Faft. Yes. Motion carried.
Section 3
Township considers mid-year budget changes for drain construction, fund transfer
The mid-year budget adjustment was handled as part of the consent agenda. The selected transcript contains the combined consent motion and vote, but no separate budget discussion.
Key details
- The motion approved the agenda, revised consent agenda, and accounts payable together. 18:55
The combined motion carried by roll-call vote. 19:17
Review notes: Consult the budget document for amounts and affected funds; no item-specific discussion was captured.
Read 6 relevant transcript excerpts
I make a motion for the approval of our agenda, including the consent agenda and accounts payable with a revision to item E.
I make a motion we approve the agenda, including the consent agenda as revised and the accounts payable.
Thank you, Jack. Support? Support. Thank you, Frank. Roll call vote, please.
Mr. Coleman.
Yes.
Ms. Batey. Yes. Mr. Hagedorn. Yes. Mr. McKellar, yes. Mrs. Morrow. Yes. And Mr. Faft. Yes. Motion carried.
Section 4
Ordinance to Amend Ordinance 787 - Plainfield Avenue Corridor Improvement Authority
The board considered the second reading of an amendment expanding the Plainfield Avenue Corridor Improvement Authority district. Staff said it would let the authority work along the full corridor and better integrate adjacent residential and commercial areas.
Key details
- The expansion included residential neighborhoods to treat residential and commercial areas as one connected neighborhood.
- A new development plan was expected in August and would later return to the board. 22:22
- Staff explained that tax-base growth above the district's base value would fund projects and characterized this as not being a tax increase.
The board approved the ordinance amendments as presented; the roll-call vote carried. 27:51
Review notes: The ordinance text controls the legal boundary and authority.
Read 38 relevant transcript excerpts
Next item on our agenda is our new business. The first item is to consider the second reading and the approval of the ordinance to amend Ordinance 787, the Plainfield Avenue Corridor Improvement Authority. Cameron?
Okay. Board, I know you're well aware of this. This is something that we've been working on for quite some time. As a part of the reimagined Plainfield project that we started... We're going back seven years now, we identified a number of tools to help revitalize the Plainfield Corridor. One of them, we had already had a Corridor Improvement Authority that had kind of lay dormant for a while due to lack of funding. And so part of this effort was to revitalize the Corridor Improvement Authority so that they could be effective in helping revitalize the corridor. In doing so, one thing we recognized, the existing corridor.
Only covered a portion of the Plainfield Avenue Commercial Corridor. Really, the southern portion did not address the area, which generally starts from Coit on north up to Northland Drive. And it kind of serves as a separate corridor, commercial corridor, but it's one avenue, one community. We felt it would be beneficial for all the businesses along there and the residents to treat it as one. And also allow the corridor improvement. So that they have the authority to do improvements through the entire length of the corridor, not just in one portion of it. The other piece that we did was expand the boundaries, or what we're proposing is expand the boundaries into residential neighborhoods.
And the real benefit there is not necessarily to do improvements in the residential areas, but to incorporate residential and commercial as one cohesive neighborhood as opposed to what in the past has often appeared to be... competing interests that abut each other. So you have residential neighborhoods, you have commercial corridor. Sometimes that leads to friction and high fences. So the intent is to have them work together a lot more seamlessly to create one commercial and residential neighborhood, not a specific residential area and commercial area, and really see the two integrated better together.
And to that logic, when we reestablished Plainfield Avenue, we were able to do that. The Corridor Improvement Authority specifically looked for membership that would represent residents as well as commercial property owners along the corridor. So this is the final step here for expanding the boundaries. So if you approve it tonight, the boundaries will be expanded. Then we can take the next step, which the Corridor Improvement Authority is already working on, which is a new development plan.
They intend to have that done in August, and then back to you for consideration. The new development plan really basically is saying what are the tasks they want to focus on, right? So what are the things? And there's a lot of confusion in the public because they hear about Corridor Improvement Authority and Plainfield Avenue. They see the improvements the township worked with MDOT on last summer, and they think the two are related. They're really not.
While medians and street improvements are something that is a legal expenditure, that's really not the focus of a Corridor Improvement Authority. It's really about a number of elements to enhance the viability of a business corridor. And traditionally, you'll see areas like DDAs, like Comstock Park DDA, do banners or maybe flower baskets or maybe events, street lights, things like that. That's the more typical nature. This group is still determining what focus they want to tackle first when they have the funding to do some projects. So that's the step before you tonight is expanding the boundaries, and then the development plan will come to you this fall.
Okay. Thank you, Cameron. At this time, I would open the floor for any public comments about this issue, specifically, if you have any.
Yeah. I need you to.
Yes. Yes, ma'am.
Talking about it, sounds like a good idea. How is it funded?
And is that strip of property? The property that's highlighted, is that the whole authority or that area? Or is that just part of it?
Cameron. Go ahead. I'm talking to you.
Yes, I understand, Dean. And you understand this is public comment, not question and answer. Oh, okay. So when you're completed, I can answer some questions. So if that's the extent of your comments.
Well, I just wondered how and is that part of tax money taken towards that? That could be used, say, for other things. So that's my question.
Okay?
Okay. Thank you. Anyone else?
Okay. I'll close the floor for public comment on this issue, and we will move on to board discussion. Do you want to?
Yeah, I can address some of the questions. So the way a tax increment, this is a tax increment-financed district. And what that means is they start with a base year, which for the new year. The new portion would be this year. Start with what the taxable value is. And as the taxable value of these properties lined in pink or lavender or whatever color you want to call that, as that grows over time, that amount of growth will go towards the Corridor Improvement Authority, which can then use it for projects in that area. So it's not a tax increase. It's using a portion of the taxes these properties are already paying to make improvements within that district. Does that extend to the questions? Is there a second? I think that covers it.
Okay. Board discussion. Jack, do you have anything?
I was just going to reiterate this is an advantage for those living close to the corridor, because those tax increase monies will go directly to that geographic area as opposed to the general fund, which Cameron already mentioned.
Thank you. Steve?
I'm all set.
Okay. Susan?
I really appreciate the extension of the boundaries all the way out to the river. That's not stopping an airway anymore. That's my good news.
Kathy?
Good question. Are we adding, because of this extension, will we be adding more people onto the committee?
That's an excellent question. Yes. As you recall, we thought we had taken this step already. Our attorneys found out that we had to take a couple more steps. So we had identified nine individuals. We had to pull back to seven. And so those other two have been kind of waiting in the wings for this action so we can add two more people back in.
Frank? I just want to repeat what Sue said. I'm glad they're extending the CAA.
Yeah. I am on the Comstock Park DDA. Not on this one.
Can't be on both. So Comstock Park, they do a facade improvement so businesses can apply for grants to improve their, I don't know if the Plainfield Quarter improvement will go that direction, but I'm assuming they may look at that.
Another example is Mill Creek Days. That's funded by the Comstock Park DDA.
They have money at their disposal to do a lot of things. They were doing some work on the trailhead there. And all kinds of things. So that's Comstock Park. Plainfield will have those same kind of opportunities on the avenue with this committee. So all right. With that being said, I would seek a motion at this time.
I make a motion to approve the amendments to the Corridor Improvement Authority Ordinance as presented. Support.
Thank you, Kathy. Support from Susan. Roll call vote, please.
Ms. Batey? Yes. Mr. Hagedorn? Yes. Mr. McKellar? Yes. Mrs. Morrow? Yes. Mr. Pfaff? Yes. And Mr. Coleman?
Yes.
Motion carried.
Section 5
Township Considers $240,500 Study for Future Water Options
The board considered a $137,500 Phase 2 engineering proposal for long-term water-source planning. Staff described a two-track study: continue looking for local groundwater capacity while evaluating regional partnerships connected to Lake Michigan water.
Key details
- Staff separated shorter-term improvements expected to help for five to ten years from the need for a durable source beyond that period.
- The township lost Versluis well-field capacity after PFAS was discovered and has not found a nearby replacement with comparable productivity. 29:55
- The local option would broaden the groundwater search along Coit Avenue. 32:23
- The regional option would evaluate systems already accessing Lake Michigan water, potentially including Grand Rapids, Muskegon, or another partner. 33:06
Questions or concerns
- Staff said the expanded groundwater search has no guarantee of finding enough capacity. 32:23
- A Grand Rapids connection was described as requiring major new transmission capacity, with potential costs in the hundreds of millions of dollars. 33:51
- Residents questioned continued contracts with Prein & Newhof, asked for performance review or competitive bidding, and sought clearer accountability for prior work and the new study. 35:25
- One resident questioned continued population growth and apartment construction while the township is planning for future water capacity. 41:52
- Trustees defended continuing the search and the engineering relationship, described the effort as long-range planning rather than a current shortage, and said the existing supply is expected to last to approximately 2035. 44:40
The board approved the Phase 2 study as presented; the roll-call vote carried. 48:04
Review notes: Likely speaker identities combine machine diarization with meeting context and may be wrong. Resident statements and trustee responses are summarized as attributed viewpoints, not verified factual findings. Uncertain place names should be checked against maps and the engineering proposal.
Read 60 relevant transcript excerpts
Item B on our agenda is to consider the water system source, hold on, consider the water system source water alternative study phase two proposal from Prein & Newhof for an estimated $137,500 for engineering fees. Cameron?
Okay. Do a reminder for everyone who is or is maybe not familiar with where we're at with the water study. Back in April, we had the phase one presentation of the water study. And for those that were not a part of that presentation, we had taken the approach of saying we're struggling to find good source water here, there, or somewhere else. Let's take a step back. Let's throw all the options on the table, good, bad, or otherwise. And let's sort through them again and make sure that we're looking at the right alternatives to find source water that will serve this community long into the future. We're not looking for short-term or Band-Aid fixes for the system.
Let's look at the long-term impact of these decisions. So we had that study that was presented to us in April. And basically, that came up with a few different things. One, there were some short-term enhancements that will help us in the next five to 10 years. That's kind of the short-term view here. But then there's a number of things that we can look at as we look beyond 10 years. What can we look for for new source water? And as a reminder, from a geographic perspective, our water plant, let's zoom in enough, our
water plant, and this is a gray aerial that shows the impact of flooding. Whenever they took this, the river was high and there was a lot of flood water. So we have a lot of flood water. We have our water plant and well fields around here. And as a reminder, we lost the capacity of the Versluis well field about a decade ago when PFAS was discovered in that area. And to replace that, we've been looking for an area possibly somewhere along the Grand River or somewhere relatively close that could produce as much water as we lost in capacity in this well field in one location. And that was our struggle.
We couldn't find a good well field location that was as productive as what we had at Versluis within a close proximity. So as a reminder, we looked across the river.
So that really brought the focus into two major solutions. One of them was continuing a groundwater search along Quaint Avenue. And as I was saying, before we searched part of this area, and it wasn't as productive as we had hoped, but now the search would change from one very tight contiguous area to probably a more linear search anywhere from maybe Jupiter on down to the end of the map here, and try to find that same amount of capacity spread over a much bigger geography. There's no guarantees that that will work either. And that's why this phase two is proposing a two-pronged approach while we explore that
and the opportunity for groundwater there, also exploring a more regional approach. And regional approach means that it would be something that we're not doing alone. We're in partnership with another community, maybe another community that already has water, or even other communities that are also looking for water and would join us in the effort. So that solution would be doing something, joining a system that is already accessing Lake Michigan water, and that could be the city of Grand Rapids, it could be the city of Muskegon, it could be somewhere in between. And honestly, as much as people think Grand Rapids is an easy solution, it's probably not as economical as anyone thinks it is
because they don't have the capacity to serve us as it is today. It will require a new transmission main basically back to Lake Michigan. So when we're talking about that kind of distance, that kind of capacity, we're talking into the hundreds of millions of dollars. So combining with Grand Rapids is not a simple or easy or cheap solution. And at that point, looking at Grand Rapids, we might as well be looking at other options as well because it's not necessarily the most economical or the most forward-thinking for our community because there are other systems that also have capacity in the area that might be a better partner long-term.
So that is the two prongs of this study that we want to explore, explore a regional partnership while we also explore the current well field to see if there's any other opportunities locally. So back to the study. So prior to that, we'll do a lot of this work. Some of this work will also be accompanied by staff working on various components of this. But we're going to start getting into specific locations along Coit Avenue to see if there's opportunities there as well as searching the Lake Michigan opportunities.
That's all I have.
Okay, thank you. I would open the floor at this time for any public comment about this issue.
Yes, sir.
Gerald Stepanovich, 4666 Weber Northeast. Sorry, I've got a few notes here. First of all, I'm actually sad. The gentleman for the titanium race, he's left because I was going to ask him if the race participants were given a list of what has been in the water in Versluis Park and in Plainfield Township water for that matter because, you know, ethylene glycol, which is antifreeze, or acetone, which is nail polish remover, both are required to be tested for. Both can be present in the water and it's still passed the Safe Drinking Act, which we operate under, you know. So, and the other question is,
to the other statement, you know, we're proposing to pay Prina Niehoff $137,000 when we just, I believe we just approved a 2.5 million capacity increase at another wellhead, you know. I mean, we just seem to keep handing Prina Niehoff money hand over fist and we're getting no results. And now you're going to, you know, there's also looking at, according to your agenda item, they're looking at private land ownership. You know, whose land? Whose land, I mean, who in the township's land is that and are we going to be able to know whose it is? Is it going to be made public? It's my money you're spending.
So, who's the private land owner that you're proposing to look at? You know, I think we should, I think those facts should be known.
You know, and then another part of it was to replace the, I saw it as, I believe it was under consent agenda that you guys voted when we started the meeting, to replace the wellhead pump buildings down at Bruce Lewis Park, to replace the roofs. For what? We haven't used them since 2016. I mean, you guys came to my house, made me cap my well, and yet you're still using wells that, or not using them, no, not using them, but you're still paying for the maintenance of the building? Those things, that's ridiculous. I mean, those buildings should be torn down and those wells capped. I mean, we got to take your word that you're not using, which I believe you're not.
I don't ever hear them run. So, I just think that's ridiculous to, that building should be turned down and it's done. No more money spent on them. And what else do I have here?
Oh, yes. Deputy, thank, welcome. Welcome to be our community service, our community neighborhood officer. And just a quick note where I live on Weber Street, since we can't get any speed bumps, I would ask you to take a seat on there, especially during golf season at Thousand Oaks, Saturdays and Sunday mornings, they tend to fly up and down that road. And I really don't want to go to jail throwing something at them. So, and I want to see you, unless it's by in a wave. Anyway, the other thing is. Time is up. Yeah, yeah, of course. Are we going to go to competitive bid instead of just giving money to Prein & Newhof?
Anyone else?
Okay, seeing no one else, I'll close the floor for public comment.
Okay, well, you got to raise your hand when I ask.
I sort of did. I'm kind of new to this three-minute thing. I'm from Lansing, and sometimes our meetings used to go to two or three o'clock in the morning. Had an opinion on this. And if you know hillbillies, if you have an opinion.
I hate to stop you, but name an address for our record, please.
Helen Fizer, 6468 Living Good Street. Rockford mailing address. Citizen of Plainfield Township. I'll just stick to my script to keep the three minutes.
So, good evening to the trustees. I'm standing here tonight because the agenda asks us to authorize another $137,000 payment to Prina Newhall to find uncontaminated water sources. Concurrently, we are looking at an overall price tag. We're well over the $2.5 million to ramp up pumping at known contaminated wells while this seemingly endless search continues.
Let's be entirely clear about where we are. We live in the second most toxic contamination site in the state of Michigan. For years, our community has dealt with the shadow of this crisis. We are not paying for a brand-new, unforeseen challenge. We are paying the exact same engineering firm that built the system and has been trying to replace things for years. As a resident and a taxpayer, I am at an absolute loss as to how this search for clean water can go on for this long at this immense cost with little or no show for it. In any other industry, if a contractor failed to deliver the core objective for a project for years,
you wouldn't blindly hand them another six-figure contract. You would halt, assess, and review. I'll get to my three questions because I'll hand this in in writing. Where is engineering performance evaluation? Has this board conducted a formal evaluation of Prein & Newhof's milestones, deliverables, and timelines over the last seven years? If not, why are we releasing more funds without a report card on their past performance? What is the accountability mechanism? What guarantees do we have that this $137,000 won't yield the exact same result as the previous funding, which is to say more ongoing searches?
Why haven't we sought a second opinion? If the current engineering strategy has left us trapped pumping contaminated water at a million-dollar expense, why are we not looking at outside experts or a peer review of Prein & Newhof's work to see what they are missing? I'll hand this in, and anybody else that wants a question, I have extra copies.
Okay, anyone else? Yes.
Good evening. Brent Fields, 4440 Plainfield. This is sad, it sounds like, because we're searching for a long time. Maybe consider another company to jump in and change from Prein & Newhof would be a thought. But what I keep thinking, I'm hearing all this, we have a water problem, obviously, but we should maybe consider maybe not putting more apartments in to astrobate, I think I'm saying that word right, the problem. Because we're putting apartments up and we're going to need more water. And we apparently need water. So I'd like to see us maybe think about that. I don't know that it's our obligation
to increase our population to 32,000 to, I don't really want to see 35,000 because then we have more traffic problems and we have to get bigger schools and we're bringing in more people. And we don't have the water to give more people. And people are here paying more for water. And we're being kind of paying for usage plus overage if you go to tier six, 40%. So maybe we should slow down in growing our population till we get our water thing figured out. Thanks.
Anyone else?
Okay. Seeing no one, I'm closing the floor for public comment and move on to board discussion. Susan, do you have anything?
Nothing that relates to what's going on tonight. Again, we need to keep, we're looking and we have a good outline.
Thank you. Steve?
I agree with Sue. We need to keep looking. We have a good outline.
Our water issues is our board's priority. We've been working on that. And I'm good for now.
All right. Thank you. Kathy?
I just, the more I learn, the more I don't know the complexity of finding water and finding the clean water and the legacy that we've been left with because of PFAS. I believe that we have halted and accessed, assessed and reviewed what Prein & Newhof is doing. And so I stand in confidence until I hear otherwise from the staff that we are to move forward with what we need to do to find water.
Thank you. Jack?
Thank you.
We have had a problem with Versluis Park. It's well known. Because we had a problem, we closed it down. I, as you all know, most of you know, I, I'm in Facebook along with many of you. I see in Facebook a repeated attempt to connect the Versluis problem with our current system. There is no connection at all. The Versluis problem, as shown by a number of wells, has headed from Versluis Park east and not toward, not west toward our, our water system. So I, I wish the attempts to make connection
between the two systems would stop.
First, and also, the attempt to provide more water is not primarily spurred by the fact that, that we are short of water. We aren't short of water. We have water for the foreseeable future. We're looking 10, 20, 30 years in the future. And many corporate people and many boards toss the, toss the ball down the road and, and let somebody else take care of it. We don't do that. We're trying very hard to make sure that 10, 20 years from now, we have enough water so that you all and,
and myself can still have water. So if somebody makes the statement, we have a shortage of water, we have no shortage of water. We have enough water right now to last to 2035. So it's not an emergency situation. What we are attempting to do is look beyond 2035. That's all I have to say.
Thanks, Jack. Frank?
I'm all set.
All right.
It's been an ongoing problem for a long time. And we continue to work hard. I, I wish folks would show up at the workshops we have so they could understand what's going on instead of coming and making a bunch of hypotheticals or false statements to us.
We,
those opportunities are out there all the time. So, I think Heidi Neuhof is, is, is doing as good a job as I can see anyone else doing. If we start with someone else, someone else is going to have to come in and learn everything all over again. So, it, it just,
yeah, listen, we're, we're doing our best. We're looking forward. This isn't a today crisis. We're looking forward, projecting growth when we're adding apartments. You know, those property owners have rights too. So, we can't just deny someone building in our township. So, it, it's a global thing. And we're trying to be proactive and make sure that we're all going to be fine years down the road. We all live in Plainfield Township too. We don't want to see a crisis happen here. I, I don't know why that's not understood better. I, I read some absolute trash on Facebook. It, it's unbelievable. So, with that being said, I'll, I'll seek a motion.
I make a motion to approve the Plainfield Charter Township Water System Source Water Alternative Study Phase 2 as presented.
Thank you, Kathy. Support? Support. Thank you,
Mr. Hagedorn?
Yes.
Mr. McKellar? Yes. Mrs. Morrow? Yes. Mr. Pfaff?
Yes. Mr. Coleman? Yes. Ms. Beatty?
Yes.
Motion carried.
Section 6
Opening and invocation
The meeting was called to order at 6 p.m., followed by an invocation and the Pledge of Allegiance.
Key details
- The chair called the July 13 meeting to order at 6 p.m. 3:10
The board proceeded to the meeting agenda after the invocation and pledge. 4:02
Review notes: The Pledge of Allegiance was not rendered as usable speech by the transcription model.
Read 1 relevant transcript excerpt
Okay, it's six o'clock and I will call to order the Plainfield Charter Township board meeting for July 13th, 2026. We'll begin our meeting with the invocation and pledge led by clerk Steve McKellar.
Section 7
Community policing deputy introduction
Kent County Sheriff's Deputy Ryan Yukimoff introduced himself as Plainfield Township's new community policing deputy. He described prior traffic-safety, crash-investigation, road-patrol, and field-training experience.
Key details
The board welcomed the deputy and said it looked forward to working with him. 14:41
Review notes: The spelling of the deputy's surname should be checked against the Sheriff's Office roster.
Read 2 relevant transcript excerpts
Good evening, members of the board. My name is Ryan Yukimoff. I have the privilege of being Plainfield Township's newest community policing deputy.
My most recent assignment just previous to this was with our Traffic Safety Unit, so I was tasked with traffic enforcement and investigating any fatal and serious injury crashes that happened in the county. Before that I was on road patrol and I was also a field training officer.
Section 8
General public comment
A resident asked township staff to investigate whether a neighboring operation had missed a July 1 deadline to remove stockpiled material, contrasting that situation with enforcement against the resident's own business.
Key details
Questions or concerns
- The claim and enforcement history were not resolved during public comment. 17:58
The chair closed general public comment without an on-record response to the enforcement request. 18:08
Review notes: This summarizes a resident's allegation, not a verified finding. The cited covenant and enforcement records were not reviewed as part of the transcript pilot.
Read 2 relevant transcript excerpts
On July 1st, 2026, there were some restrictive covenants deadlines that came into effect... Other material must be removed no later than July 1st, 2026.
Our neighbor can still continue to have trucks in and out selling material, even though the deadlines are clearly not met... I wish this board would task their staff to look into it because nobody can say that's fair.
Section 9
Superintendent's comments
After a heated exchange concerning Facebook comments and a resident's removal from the meeting, the superintendent announced early-voting room restrictions from July 25 through August 2, an August 24 budget workshop, and anticipated Northland Drive tunnel construction and closures beginning September 11.
Key details
Questions or concerns
- An exchange about Facebook comments escalated, and the superintendent requested that a resident be removed from the meeting. 48:33
The superintendent completed the calendar and construction announcements before the meeting moved to board comments. 51:04
Review notes: The transcript does not independently establish what occurred before the exchange or whether the resident was removed.
Read 3 relevant transcript excerpts
When it comes to the ignorance of Facebook, usually I just ignore it... Can we have Mr. Stepanovich removed, please?
Early voting will start July 25. This room is the early voting center. That means no other meetings, no other events may take place in this room from July 25 through August 2... We will have our first workshop on the 24th of August.
The county parks department has got some dates anticipated for work on the tunnel under Northland. Northland Drive will be shut down in sections starting on September 11.
Section 10
Board members' comments
Trustees discussed library construction and ballot access, requested multi-year data on whether tiered water rates reduce peak demand, encouraged residents with questions to contact township officials, and recognized the retiring Kent County sheriff and the township's relationship with the Sheriff's Office.
Key details
- A trustee praised driver accommodation around library construction and noted continued ballot drop-off access. 51:30
- A trustee requested a multi-year comparison to see whether tiered water rates are reducing peak demand. 52:58
- A trustee invited residents with good-faith questions to contact officials and mentioned arranging water-plant tours. 54:24
- The chair recognized the retiring Kent County sheriff and praised the township's relationship with the Sheriff's Office. 55:27
Questions or concerns
- Staff cautioned that rainfall differences make a one-year water-use comparison unreliable and suggested looking across multiple years. 53:25
No formal action was taken during board comments. 56:19
Review notes: Likely speaker identities combine machine diarization with meeting context and may be wrong.
Read 3 relevant transcript excerpts
I think that the tiered system for the water, in my mind personally, might be working. Will we get a comparison this year's pumpage... just to see the data to support that?
Facebook can be a positive thing for people that have legitimate questions as to what's going on in the township... I've set up meetings already with people that want to go on a tour through the water plant.
Our township has a fantastic relationship with the Sheriff's Office. The addition of Ryan tonight is just another positive thing on our behalf.
Section 11
Adjournment
The meeting adjourned after board comments.
The chair adjourned the meeting after board comments. 56:21
Read 1 relevant transcript excerpt
And with that, we're adjourned.