Back to actions to watch

Plainfield approves $240,500 water study after residents question cost and oversight

The board voted to keep searching for a long-term water source through local groundwater and regional Lake Michigan options. The decision followed pointed public criticism of the township's engineering spending, consultant accountability, and continued growth.

Provisional status Approved — provisional

Observed in the township's published meeting video; awaiting official minutes or another official action record.

Unofficial transcript and meeting video: Motion carried at 48:27

Official record status: Still pending

What this is Township Considers $240,500 Study for Future Water Options

The story

Why this decision matters

Why Plainfield is looking

PFAS contamination took the Versluis well field out of service about a decade ago, and the township has not found one nearby replacement with comparable capacity. A trustee said the current system has enough water to about 2035, framing this as long-range planning rather than a present shortage. Background at 29:55

What the study would do

Phase 2 follows two tracks: widen the search for groundwater along Coit Avenue and study regional partnerships with systems connected to Lake Michigan water. Staff warned neither route is simple or guaranteed. Study options at 32:23

Who commented—and what they raised

Gerald Stepanovich

Questioned repeated payments to Prein & Newhof, asked whose private land might be studied, criticized spending on unused well buildings, and asked whether the work would be competitively bid. 36:07

Helen Fizer

Asked whether the township had formally evaluated the engineer's performance, what accountability would attach to the new contract, and why the board had not sought an outside review or second opinion. 40:15

Brent Fields

Urged the township to consider slowing apartment construction and population growth while long-term water capacity remains unresolved. 41:52

How trustees responded

  • Trustee Kathey Batey said the township had assessed and reviewed Prein & Newhof's work and that she remained confident in moving forward. 43:55
  • Treasurer Jack Hagedorn said the township does not face a current shortage and is planning beyond roughly 2035; he also rejected a connection between the closed Versluis field and the current operating system. 44:40
  • Supervisor Tom Coleman defended the township's continued work with Prein & Newhof and said growth and property rights are part of the long-range planning problem. 47:00

What happened

The board approved the Phase 2 study as presented after a roll-call vote.

Watch the motion and vote at 48:04

What happens next: Watch for the official July 13 minutes, then for direction on which local drilling work and regional partnership analysis the township authorizes first.

This account is based on the township's published meeting video and a reviewed machine transcript. Speaker labels and wording may contain errors; the vote remains provisional until official minutes or another official action record are published.

Issue timeline 5 recorded events Expand
  1. Agenda posted from agenda · published Apr 22, 2026
  2. Listed for a meeting from agenda · published Apr 22, 2026
  3. Agenda posted from agenda · published Jul 9, 2026
  4. Listed for a meeting from agenda · published Jul 9, 2026
  5. Board approval observed Provisional Motion carried at 48:27

This item appeared at a past meeting, but minutes or final action evidence are not in the local record yet. Action may have been taken not yet represented here.

Unofficial meeting readout

What was said at the meeting

Expand

Generated from the township's published video. This is not an official transcript or approved minutes and may contain transcription errors.

The board considered a $137,500 Phase 2 engineering proposal for long-term water-source planning. Staff described a two-track study: continue looking for local groundwater capacity while evaluating regional partnerships connected to Lake Michigan water.

Key details

  • Staff separated shorter-term improvements expected to help for five to ten years from the need for a durable source beyond that period.
  • The township lost Versluis well-field capacity after PFAS was discovered and has not found a nearby replacement with comparable productivity. 29:55
  • The local option would broaden the groundwater search along Coit Avenue. 32:23
  • The regional option would evaluate systems already accessing Lake Michigan water, potentially including Grand Rapids, Muskegon, or another partner. 33:06

Questions or concerns raised

  • Staff said the expanded groundwater search has no guarantee of finding enough capacity. 32:23
  • A Grand Rapids connection was described as requiring major new transmission capacity, with potential costs in the hundreds of millions of dollars. 33:51
  • Residents questioned continued contracts with Prein & Newhof, asked for performance review or competitive bidding, and sought clearer accountability for prior work and the new study. 35:25
  • One resident questioned continued population growth and apartment construction while the township is planning for future water capacity. 41:52
  • Trustees defended continuing the search and the engineering relationship, described the effort as long-range planning rather than a current shortage, and said the existing supply is expected to last to approximately 2035. 44:40

What happened

The board approved the Phase 2 study as presented; the roll-call vote carried. 48:04

Review notes: Likely speaker identities combine machine diarization with meeting context and may be wrong. Resident statements and trustee responses are summarized as attributed viewpoints, not verified factual findings. Uncertain place names should be checked against maps and the engineering proposal.

Relevant transcript excerpts

28:15 Likely Tom Coleman reviewed correction
Item B on our agenda is to consider the water system source, hold on, consider the water system source water alternative study phase two proposal from Prein & Newhof for an estimated $137,500 for engineering fees. Cameron?
28:35 Likely Cameron Van Wyngarden unknown confidence
Okay. Do a reminder for everyone who is or is maybe not familiar with where we're at with the water study. Back in April, we had the phase one presentation of the water study. And for those that were not a part of that presentation, we had taken the approach of saying we're struggling to find good source water here, there, or somewhere else. Let's take a step back. Let's throw all the options on the table, good, bad, or otherwise. And let's sort through them again and make sure that we're looking at the right alternatives to find source water that will serve this community long into the future. We're not looking for short-term or Band-Aid fixes for the system.
29:18 Likely Cameron Van Wyngarden unknown confidence
Let's look at the long-term impact of these decisions. So we had that study that was presented to us in April. And basically, that came up with a few different things. One, there were some short-term enhancements that will help us in the next five to 10 years. That's kind of the short-term view here. But then there's a number of things that we can look at as we look beyond 10 years. What can we look for for new source water? And as a reminder, from a geographic perspective, our water plant, let's zoom in enough, our
29:55 Likely Cameron Van Wyngarden unknown confidence
water plant, and this is a gray aerial that shows the impact of flooding. Whenever they took this, the river was high and there was a lot of flood water. So we have a lot of flood water. We have our water plant and well fields around here. And as a reminder, we lost the capacity of the Versluis well field about a decade ago when PFAS was discovered in that area. And to replace that, we've been looking for an area possibly somewhere along the Grand River or somewhere relatively close that could produce as much water as we lost in capacity in this well field in one location. And that was our struggle.
30:37 Likely Cameron Van Wyngarden unknown confidence
We couldn't find a good well field location that was as productive as what we had at Versluis within a close proximity. So as a reminder, we looked across the river.
32:23 Likely Cameron Van Wyngarden unknown confidence
So that really brought the focus into two major solutions. One of them was continuing a groundwater search along Quaint Avenue. And as I was saying, before we searched part of this area, and it wasn't as productive as we had hoped, but now the search would change from one very tight contiguous area to probably a more linear search anywhere from maybe Jupiter on down to the end of the map here, and try to find that same amount of capacity spread over a much bigger geography. There's no guarantees that that will work either. And that's why this phase two is proposing a two-pronged approach while we explore that
33:06 Likely Cameron Van Wyngarden unknown confidence
and the opportunity for groundwater there, also exploring a more regional approach. And regional approach means that it would be something that we're not doing alone. We're in partnership with another community, maybe another community that already has water, or even other communities that are also looking for water and would join us in the effort. So that solution would be doing something, joining a system that is already accessing Lake Michigan water, and that could be the city of Grand Rapids, it could be the city of Muskegon, it could be somewhere in between. And honestly, as much as people think Grand Rapids is an easy solution, it's probably not as economical as anyone thinks it is
33:51 Likely Cameron Van Wyngarden unknown confidence
because they don't have the capacity to serve us as it is today. It will require a new transmission main basically back to Lake Michigan. So when we're talking about that kind of distance, that kind of capacity, we're talking into the hundreds of millions of dollars. So combining with Grand Rapids is not a simple or easy or cheap solution. And at that point, looking at Grand Rapids, we might as well be looking at other options as well because it's not necessarily the most economical or the most forward-thinking for our community because there are other systems that also have capacity in the area that might be a better partner long-term.
34:31 Likely Cameron Van Wyngarden unknown confidence
So that is the two prongs of this study that we want to explore, explore a regional partnership while we also explore the current well field to see if there's any other opportunities locally. So back to the study. So prior to that, we'll do a lot of this work. Some of this work will also be accompanied by staff working on various components of this. But we're going to start getting into specific locations along Coit Avenue to see if there's opportunities there as well as searching the Lake Michigan opportunities.
35:11 Likely Tom Coleman unknown confidence
Okay, thank you. I would open the floor at this time for any public comment about this issue.
35:25 Likely Gerald Stepanovich unknown confidence
Gerald Stepanovich, 4666 Weber Northeast. Sorry, I've got a few notes here. First of all, I'm actually sad. The gentleman for the titanium race, he's left because I was going to ask him if the race participants were given a list of what has been in the water in Versluis Park and in Plainfield Township water for that matter because, you know, ethylene glycol, which is antifreeze, or acetone, which is nail polish remover, both are required to be tested for. Both can be present in the water and it's still passed the Safe Drinking Act, which we operate under, you know. So, and the other question is,
36:07 Likely Gerald Stepanovich unknown confidence
to the other statement, you know, we're proposing to pay Prina Niehoff $137,000 when we just, I believe we just approved a 2.5 million capacity increase at another wellhead, you know. I mean, we just seem to keep handing Prina Niehoff money hand over fist and we're getting no results. And now you're going to, you know, there's also looking at, according to your agenda item, they're looking at private land ownership. You know, whose land? Whose land, I mean, who in the township's land is that and are we going to be able to know whose it is? Is it going to be made public? It's my money you're spending.
36:51 Likely Gerald Stepanovich unknown confidence
So, who's the private land owner that you're proposing to look at? You know, I think we should, I think those facts should be known.
36:59 Likely Gerald Stepanovich unknown confidence
You know, and then another part of it was to replace the, I saw it as, I believe it was under consent agenda that you guys voted when we started the meeting, to replace the wellhead pump buildings down at Bruce Lewis Park, to replace the roofs. For what? We haven't used them since 2016. I mean, you guys came to my house, made me cap my well, and yet you're still using wells that, or not using them, no, not using them, but you're still paying for the maintenance of the building? Those things, that's ridiculous. I mean, those buildings should be torn down and those wells capped. I mean, we got to take your word that you're not using, which I believe you're not.
37:43 Likely Gerald Stepanovich unknown confidence
I don't ever hear them run. So, I just think that's ridiculous to, that building should be turned down and it's done. No more money spent on them. And what else do I have here?
37:57 Likely Gerald Stepanovich reviewed correction
Oh, yes. Deputy, thank, welcome. Welcome to be our community service, our community neighborhood officer. And just a quick note where I live on Weber Street, since we can't get any speed bumps, I would ask you to take a seat on there, especially during golf season at Thousand Oaks, Saturdays and Sunday mornings, they tend to fly up and down that road. And I really don't want to go to jail throwing something at them. So, and I want to see you, unless it's by in a wave. Anyway, the other thing is. Time is up. Yeah, yeah, of course. Are we going to go to competitive bid instead of just giving money to Prein & Newhof?
38:39 Likely Tom Coleman unknown confidence
Okay, seeing no one else, I'll close the floor for public comment.
38:43 Likely Tom Coleman unknown confidence
Okay, well, you got to raise your hand when I ask.
38:46 Likely Helen Fizer unknown confidence
I sort of did. I'm kind of new to this three-minute thing. I'm from Lansing, and sometimes our meetings used to go to two or three o'clock in the morning. Had an opinion on this. And if you know hillbillies, if you have an opinion.
39:01 Likely Tom Coleman unknown confidence
I hate to stop you, but name an address for our record, please.
39:04 Likely Helen Fizer unknown confidence
Helen Fizer, 6468 Living Good Street. Rockford mailing address. Citizen of Plainfield Township. I'll just stick to my script to keep the three minutes.
39:18 Likely Helen Fizer unknown confidence
So, good evening to the trustees. I'm standing here tonight because the agenda asks us to authorize another $137,000 payment to Prina Newhall to find uncontaminated water sources. Concurrently, we are looking at an overall price tag. We're well over the $2.5 million to ramp up pumping at known contaminated wells while this seemingly endless search continues.
39:49 Likely Helen Fizer unknown confidence
Let's be entirely clear about where we are. We live in the second most toxic contamination site in the state of Michigan. For years, our community has dealt with the shadow of this crisis. We are not paying for a brand-new, unforeseen challenge. We are paying the exact same engineering firm that built the system and has been trying to replace things for years. As a resident and a taxpayer, I am at an absolute loss as to how this search for clean water can go on for this long at this immense cost with little or no show for it. In any other industry, if a contractor failed to deliver the core objective for a project for years,
40:32 Likely Helen Fizer reviewed correction
you wouldn't blindly hand them another six-figure contract. You would halt, assess, and review. I'll get to my three questions because I'll hand this in in writing. Where is engineering performance evaluation? Has this board conducted a formal evaluation of Prein & Newhof's milestones, deliverables, and timelines over the last seven years? If not, why are we releasing more funds without a report card on their past performance? What is the accountability mechanism? What guarantees do we have that this $137,000 won't yield the exact same result as the previous funding, which is to say more ongoing searches?
41:15 Likely Helen Fizer reviewed correction
Why haven't we sought a second opinion? If the current engineering strategy has left us trapped pumping contaminated water at a million-dollar expense, why are we not looking at outside experts or a peer review of Prein & Newhof's work to see what they are missing? I'll hand this in, and anybody else that wants a question, I have extra copies.
41:52 Likely Brent Fields reviewed correction
Good evening. Brent Fields, 4440 Plainfield. This is sad, it sounds like, because we're searching for a long time. Maybe consider another company to jump in and change from Prein & Newhof would be a thought. But what I keep thinking, I'm hearing all this, we have a water problem, obviously, but we should maybe consider maybe not putting more apartments in to astrobate, I think I'm saying that word right, the problem. Because we're putting apartments up and we're going to need more water. And we apparently need water. So I'd like to see us maybe think about that. I don't know that it's our obligation
42:33 Likely Brent Fields unknown confidence
to increase our population to 32,000 to, I don't really want to see 35,000 because then we have more traffic problems and we have to get bigger schools and we're bringing in more people. And we don't have the water to give more people. And people are here paying more for water. And we're being kind of paying for usage plus overage if you go to tier six, 40%. So maybe we should slow down in growing our population till we get our water thing figured out. Thanks.
43:09 Likely Tom Coleman unknown confidence
Okay. Seeing no one, I'm closing the floor for public comment and move on to board discussion. Susan, do you have anything?
43:18 Likely Susan Morrow unknown confidence
Nothing that relates to what's going on tonight. Again, we need to keep, we're looking and we have a good outline.
43:32 Likely Steve McKellar unknown confidence
I agree with Sue. We need to keep looking. We have a good outline.
43:40 Likely Steve McKellar unknown confidence
Our water issues is our board's priority. We've been working on that. And I'm good for now.
43:55 Likely Kathey Batey reviewed correction
I just, the more I learn, the more I don't know the complexity of finding water and finding the clean water and the legacy that we've been left with because of PFAS. I believe that we have halted and accessed, assessed and reviewed what Prein & Newhof is doing. And so I stand in confidence until I hear otherwise from the staff that we are to move forward with what we need to do to find water.
44:40 Likely Jack Hagedorn unknown confidence
We have had a problem with Versluis Park. It's well known. Because we had a problem, we closed it down. I, as you all know, most of you know, I, I'm in Facebook along with many of you. I see in Facebook a repeated attempt to connect the Versluis problem with our current system. There is no connection at all. The Versluis problem, as shown by a number of wells, has headed from Versluis Park east and not toward, not west toward our, our water system. So I, I wish the attempts to make connection
45:24 Likely Jack Hagedorn unknown confidence
between the two systems would stop.
45:29 Likely Jack Hagedorn unknown confidence
First, and also, the attempt to provide more water is not primarily spurred by the fact that, that we are short of water. We aren't short of water. We have water for the foreseeable future. We're looking 10, 20, 30 years in the future. And many corporate people and many boards toss the, toss the ball down the road and, and let somebody else take care of it. We don't do that. We're trying very hard to make sure that 10, 20 years from now, we have enough water so that you all and,
46:12 Likely Jack Hagedorn unknown confidence
and myself can still have water. So if somebody makes the statement, we have a shortage of water, we have no shortage of water. We have enough water right now to last to 2035. So it's not an emergency situation. What we are attempting to do is look beyond 2035. That's all I have to say.
46:42 Likely Tom Coleman unknown confidence
It's been an ongoing problem for a long time. And we continue to work hard. I, I wish folks would show up at the workshops we have so they could understand what's going on instead of coming and making a bunch of hypotheticals or false statements to us.
47:00 Likely Tom Coleman unknown confidence
those opportunities are out there all the time. So, I think Heidi Neuhof is, is, is doing as good a job as I can see anyone else doing. If we start with someone else, someone else is going to have to come in and learn everything all over again. So, it, it just,
47:20 Likely Tom Coleman unknown confidence
yeah, listen, we're, we're doing our best. We're looking forward. This isn't a today crisis. We're looking forward, projecting growth when we're adding apartments. You know, those property owners have rights too. So, we can't just deny someone building in our township. So, it, it's a global thing. And we're trying to be proactive and make sure that we're all going to be fine years down the road. We all live in Plainfield Township too. We don't want to see a crisis happen here. I, I don't know why that's not understood better. I, I read some absolute trash on Facebook. It, it's unbelievable. So, with that being said, I'll, I'll seek a motion.
48:04 Likely Kathey Batey unknown confidence
I make a motion to approve the Plainfield Charter Township Water System Source Water Alternative Study Phase 2 as presented.
48:13 Likely Tom Coleman unknown confidence
Thank you, Kathy. Support? Support. Thank you,
48:20 Likely Steve McKellar unknown confidence
Mr. McKellar? Yes. Mrs. Morrow? Yes. Mr. Pfaff?
48:24 Likely Tom Coleman unknown confidence
Yes. Mr. Coleman? Yes. Ms. Beatty?
Watch the complete township video

Supporting records

These related records help explain the item, including the agenda listing, staff explanation, and draft text.

Agenda listing agenda

April 27, 2026 Board Workshop

a. Hold a workshop on the source water study as presented by Prein & Newhof

Pages 1 · Lines 8

Read excerpt
Hold a workshop on the source water study as presented by Prein & Newhof
Staff memo agenda attachment

Engineering Services Summary - Source Water Study, Phase 2

Engineering Scope and Fee Estimates

Pages 1 · Lines 14-15

Read excerpt
Engineering Scope and Fee Estimates The engineering scope of services for the Phase 2 study are proposed to be conducted on an asdirected basis for the following three work areas. Work in each area will be conducted in parallel as practical, and as directed by the Township:
Staff memo agenda attachment

Engineering Services Summary - Source Water Study, Phase 2

Estimate of Fees

Pages 3-4 · Lines 50-61

Read excerpt
Estimate of Fees The engineering services fees for this project are estimated to be $137,500, and drilling fees are estimated to be $103,000 (billed directly to Plainfield Township), should all activities be authorized by the Township. Work will be completed in accordance with the terms of our Master Agreement for General Engineering Services. Mr. Cameron VanWyngarden June 29, 2026 Page 4 Please don't hesitate to co…
Staff memo agenda attachment

Engineering Services Summary - Source Water Study, Phase 2

Purpose

Pages 1 · Lines 12-13

Read excerpt
Purpose The proposed efforts in this scope of work are intended to support the Township's pursuit of three source water alternatives. This narrowed focus on three alternatives is intended to empower the Township with information on next steps. At the conclusion of the Phase 2 study, it is our intent to provide sound technical information for determining the path forward.
Staff memo agenda attachment

Engineering Services Summary - Source Water Study, Phase 2

Dear Mr. Van Wyngarden:

Pages 1 · Lines 8-9

Read excerpt
Dear Mr. Van Wyngarden: In accordance with recent discussions, we are providing background information, a description of the scope of services included in this proposal, the anticipated schedule for the study, and an estimate of the engineering fees for the proposed Source Water Alternatives Analysis -Phase 2 .

Meeting history

Agenda and minutes records showing when this item appeared and what procedural step it reached over time.

Minutes record minutes

April 27, 2026 Board Workshop

Listed on agenda

2026-04-27T18:00:00-04:00

Read excerpt
The item appeared on the Board of Trustees Workshop agenda: Hold a workshop on the source water study as presented by Prein & Newhof Hold a workshop on the source water study as presented by Prein & Newhof
Timeline record document

Linked source records

Listed on agenda

2026-04-27T18:00:00Z

Read excerpt
The item appeared on the Board of Trustees Workshop agenda: Hold a workshop on the source water study as presented by Prein & Newhof Hold a workshop on the source water study as presented by Prein & Newhof
Timeline record agenda

Township Board Meeting Agenda - July 13, 2026

Listed on agenda

2026-07-13T18:00:00-04:00

Read excerpt
The item appeared on the Board of Trustees Meeting agenda: Consider the Water System Source Water Alternatives Study - Phase 2 proposal from Prein & Newhof for an estimated $137,500.00 for engineering fees Consider the Water System Source Water Alternatives Study - Phase 2 proposal from Prein & Newhof for an estimated $137,500.00 for engineering fees

Accuracy note

Civic Desk summarizes public records to make local issues easier to follow. Mistakes, omissions, or outdated details are possible, especially when an issue is still moving through meetings. Before relying on an item for an important decision, verify the details in the linked source documents or with the township directly.